Sitting atop the draft “wish list” for the Haines Borough’s capital requests to the Alaska Legislature is about $2-2.5 million in upgrades to Lutak Dock.
Dock resurfacing and drainage improvements ($500,000), capacity upgrades and repairs ($600,000), and high mast lighting ($400,000) make up the bulk of the project. Onshore and underwater surveys to determine future dock modifications, plus design and permitting expenses, comprise the remaining costs.
Harbormaster Phillip Benner said the area near the dock…

