The Haines Borough Assembly is looking into the cost of moving Lookout Park to keep it from being engulfed by a parking lot in the Small Boat Harbor expansion project.
The assembly voted last week to have manager David Sosa get estimates from PND Engineers on the cost of moving the park farther south on the waterfront.
PND’s 35-percent design would add about 2.75 acres to the existing parking lot, surrounding the park and stretching…

