Chilkat Valley News - Serving Haines and Klukwan, Alaska since 1966

Breakwater draft study: Sea floor soft

 


Extending the rubble mound breakwater is likely not an option for the South Portage Cove harbor expansion project, according to the preliminary results of a recently conducted geotechnical survey.

Installation of a metal wave barrier will probabl...



For access to this article please sign in or subscribe.










 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2019

Rendered 11/17/2019 21:59